- A
-
ACHAR
Aboriginal Cultural Heritage Assessment Report
-
AECG
Aboriginal Education Consultative Group
-
AHIMS
Aboriginal Heritage Information Management System
-
AMS
DoE Asset management System
-
AMU
DoE Asset Management Unit
-
ANEF
Aircraft Noise Exposure Forecast
-
Approved Project Budget
The budget approved through Project Governance used as the baseline for cost reporting
-
Approved Project Program
The program approved through Project Governance used as the baseline for time and schedule reporting
-
APZ
Asset Protection Zone
-
AS
Australian Standards
-
AV
Audio Visual
- B
-
BC
Business case
-
BCA
Building Code of Australia
-
BCP
Business Case Partner
-
BD
Behavioural Disorder classification SSP schools
-
BD/CD/ED
Behavioural Disorders - classification of SSP schools (BD), Conduct Disorders (CD) and Emotional Disturbance (ED)
-
BIM
Building Information Model/s
-
BMS
Building Management System
-
Business Case Partner
The consultant engaged by SINSW responsible for preparing the Business Cases for the Project
- C
-
CAD
Computer Aided Design
-
CBA
Cost Benefit Analysis
-
CBEP
Construction BIM Execution Plan
-
CCTV
Closed-Circuit Television
-
CD
Conduct Disorders classification SSP schools
-
CE
Chief Executive of SINSW
-
CEP
Communications and Engagement Strategy
-
CLT
Cross Laminated Timber
-
COLA
Covered Outdoor Learning Area
-
Core
The indicative size of an existing primary school used on upgrade projects and based on the maximum student population
-
CPR
Consultant or Contractor Performance Review
-
CPTED
Crime Prevention through Environmental Design
-
CRF
Critical Radiant Flux
- D
-
D&C
Design and Construct
-
DA
Development Application
-
DBEP
Digital Engineering Execution Plan
-
DCP
Development Control Plan
-
DEL
Director Education Leadership
-
Design Certificate
Certificates for other consultants confirming the design is complete at each phase
-
DfMA
Design for Manufacturing and Assembly
-
DoE
NSW Department of Education
-
DPIE
Department of Planning Industry and Environment
-
DS
Departures Schedule
- E
-
ECI
Early Contractor Involvement
-
ED
Emotional Disturbance classification SSP schools
-
EDB
Electrical Distribution Board
-
Educational Rationale
How the School will meet educational objectives
-
EFSG
Educational Facilities Standards and Guidelines
-
EPA
Environmental Protection Authority
-
ESEPP
Education State Environmental Planning Policy
-
Executive Principal
Highest ranking member of staff within a school. Principal of a School
- F
-
FBC
Final Business Case
-
FDB
Functional Design Brief
-
FECA
Fully Enclosed Covered Area which includes all spaces that are enclosed with a roof, a façade and floor slab. Including internal stairs, engineering,
-
Federated Model
A combined Building Information Model containing multiple discipline/trade models which can be used for coordination, visualisation and collaboration
-
FF&E
Furniture, Fittings & Equipment
-
FSA
Floor Space Ratio
- G
-
GAO
Government Architects Office
-
GBCA
Green Building Council of Australia
-
General Learning Hub
The core teaching and learning environment for primary and high school, comprised of four GLSs (General Learning Space), and Learning Commons (LC)
-
GFA
Gross Floor Area
-
GIS
Geographic Information System
-
GLS
General Learning Space
-
GREP
NSW Government Resource Efficiency Policy
- H
-
HMR
High Moisture Resistant
-
HOB
Height of Building
-
HV Cable
High Voltage Cable
-
HVAC
Heating, Ventilation and Air Conditioning system
- I
-
ID
Moderate Intellectual Disability classification SSP schools
-
Infrastructure Services Master Plan
The master plan for utilities and services
-
IO/IS/P
Support classes classification (IO) Moderate Intellectual Disability, Severe Intellectual Disability (IS) and significant Physical Disability (P)
-
ITD
Information Technology Directorate
- L
-
LAN
Local Area Network
-
LCC
Life Cycle Cost
-
Learning Commons (LC)
SLEC definition to be inserted here
-
LEP
Local Environmental Plan
-
LGA
Local Government Area
-
LSPS
Local Strategic Planning Statements Land Zoning
-
LZN
Land Zoning
- M
-
Master plan Report
The report developed in accordance with the Masterplan Guideline and EFSG Standards
-
MDF
Medium density fibreboard
-
MSB
Main Swithcboard
-
Multi-purpose Space
An adaptable space suitable for student, staff, parent and community gathering SLEC to confirm definition
- N
-
NATA
National association of testing authorities Australia
-
NATSPEC
National Building Specification
-
NCC
National Construction Code
- O
-
OEP
Offer Evaluation Plan
-
Operational Commissioning Strategy
The strategy for bringing a school into operation in the form of the SI Template
-
OSHC
Out of School Hours Care
-
Other Consultants
Consultants other than the Project Manager engaged for the project
- P
-
PAA
Practical Activities Area
-
PAP
Principal’s Authorised Person
-
PCA
Principal Certifying Authority
-
PCG
Project Control Group
-
Phases
As defined by the SINSW project delivery process
-
PIR
Project Information Requirements
-
POE
Post Occupancy Evaluation
-
Practice Note - Design
The document prepared by SINSW setting out design deliverables and processes for architectural services
-
PRG
Project Reference Group
-
Principal
School Infrastructure NSW
-
Project Governance Arrangements
The document prepared in accordance with the guideline Project Governance Requirements and Structure OCE-ST-01
-
Project Manager
The consultant engaged by SINSW responsible for coordination of the Project
-
PS
Public School
-
PTE
Pre-Tender Estimate
-
PV
Photovoltaic
- Q
-
QA
Quality Assurance
- R
-
RACI
Responsibility, Accountability, Consulted and Informed
-
REF
Review of Environmental Factors
-
RFI
Request for Information
-
RFO
Request for Offer
-
RFT
Request for Tender
-
RNP
Road Noise Policy
-
RW
Weighted Sound Reduction Index
- S
-
SBC
Strategic Business Case
-
Schematic Design Report
The report developed in accordance with the Practice Note – Design and the EFSGs
-
School Plan
The plan prepared by the school setting out education objectives and operations over the project period, included within the Reference Documents
-
SEA
School Environmental Area
-
SELU
Special Education Learning Units
-
SEPP
State Environmental Planning Policies
-
Service Delivery Plan
The plan to be prepared by a consultant setting out how they will deliver the Services
-
Service Need
The educational and operational services to be met by the Project as defined by SINSW
-
SI Portal
School Infrastructure Financial and Document Management System
-
SI Templates
School Infrastructure Templates
-
SiD
Safety in Design
-
SINSW
School Infrastructure NSW and Principal (in terms of contractual engagement)
-
SLEC
Schools Learning Environments and Change
-
SoA; SOA
Schedule of Accommodation (Areas)
-
SRS
Sound Reinforcement System
-
SSDA
State Significant Development Application
-
SSP
School for Specific Purposes
-
STI
Speech Transmission Index
-
Stream
The indicative size of an existing high school used on upgrade projects and based on the maximum student population
- T
-
TAS
Technical and Applied Sciences
-
TEP
Tender Evaluation Plan
-
TSG
SINSW Technical Stakeholder Group
- U
-
UCA
Unenclosed Covered Area which includes all spaces that have a roof and a slab but are unenclosed (without a façade). This includes circulation and COL
-
UFA
Useable Floor Area which are teaching spaces and support spaces and include homebases, storage, general learning spaces, labs, workshops, libraries et
- V
-
VM
Value Management
-
VoIP
Voice over Internet Protocol
- W
-
WAN
Wide Area Network
-
WD
Withdrawal Room
-
WELS
Water Efficiency Labelling and Standards Scheme
-
WHS
Work Health and Safety
-
WOL
Whole of Life
-
WSUD
Water Sensitive Urban Design
- X
-
XS, S, M, L
Indicative size of new primary and high schools based on the student population
- Z
-
Zones (within the learning hub)